Monday, October 7, 2013

Cabin Heat Cable Clamps

I installed the2-remaining cushioned clamp assemblies holding the heater cable to the engine mount.  I also installed the friction comb.  
I screwed the rod end into the cable end with the jamb nut.  I cut the control wire to the correct length, marked then bent it around the cotter pin and installed the wire and cotter pin on the control cable.  I attached the rod end to the cooler door.  I need to order a castle nut from Van’s to complete the installation.  After I was satisfied that the cooler door was opening and closing properly and with the correct distance of the know to the instrument panel (1/16”) I safety wired the last cushioned clamp assembly.