I screwed the rod end into the cable end with
the jamb nut. I cut the control wire to the
correct length, marked then bent it around the cotter pin and installed the
wire and cotter pin on the control cable.
I attached the rod end to the cooler door. I need to order a castle nut from Van’s to
complete the installation. After I was
satisfied that the cooler door was opening and closing properly and with the correct
distance of the know to the instrument panel (1/16”) I safety wired the last
cushioned clamp assembly.