Wednesday, October 27, 2010

Installation of Step Floors

Today I dimpled a whole pile of nutplates.  I riveted 4-nutplates to the top flange of the step floor bulkhead.  I dimpled the #30 and #40 holes at the inboard edges of the step floors.  I installed 8-each nutplates as instructed.  I then began to rivet the step floors in place using the flush and pulled rivets.  I also installed the corner nutplates at the front corner edge of the floors where they meet the inboard ribs.  What a trick that was to get the nutplates oriented in the blind space they are located in.
I riveted the right step floor in place.  I will finish riveting the left floor tomorrow.