Today I did some work towards the installation
of the new fuel tank vent system. I
removed the right turtle deck. I also
checked on the Pro-Seal installed a couple of days ago. It seems to be curing just fine. All of the rivets have been set. When I install the sender plate on the
forward end of the tank I will make sure all of the rivet heads have been
filled with Pro-Seal. I did a test fit
of the baggage area upholstery. The
vinyl covered part the installs above the fuel tank. I marked the location for the ½" diameter
hole that will be drilled through the upholstered bulkhead cover and the bulkhead.
I then decided to cash-it-in for the day.
I covered the cockpit area with some plastic
sheeting to keep the drips out.