Using the rose
cutter I recessed the #40 nutplate holes for the flush rivets. I used my microstop to countersink the holes
in the forward half for the #6 mounting screws.
I reassembled the pants and drilled the remaining 6-holes. Following the same procedure I installed
nutplates at these holes and countersunk the corresponding holes in the forward
half. I then reinstalled the left wheel
pant on the left main gear. Next I
installed the PVC fairing I purchased at the base of the gear leg where it
enters the wheel pants. I drilled holes
and installed nutplates on the pants. The
fairing will be held in place with 3-#6 pan head screws.
I then repeated
the process to install the right main gear pants and fairing. I disassembled both fairings and pants and
put them away for now. Next I will begin
to install the nose wheel pants and gear leg fairing. I
have decided to install the main gear leg fairings at the fuselage with pulled
rivets after the certification inspection