I clecoed the baggage floors to the center section and squeezed the rivets in place.
This morning I prepped and primed the baggage floor ribs.
This afternoon I clecoed and riveted the ribs to the center section aft bulkhead. I then turned the assemble over and riveted the ribs to the baggage floors.