Wednesday, September 15, 2010

Baggage Floor and Ribs

I clecoed the baggage floors to the center section and squeezed the rivets in place.  
This morning I prepped and primed the baggage floor ribs.  
This afternoon I clecoed and riveted the ribs to the center section aft bulkhead.  I then turned the assemble over and riveted the ribs to the baggage floors.