Tuesday, September 21, 2010

Assembled Aft Bulkhead Parts and Pieces

This morning I prepped the ribs and bearing brackets for priming.  I primed the various parts and then began to assemble them.
I assembled the bearing brackets and riveted the nutplates to the center ribs.
I riveted the aft bulkhead to the baggage area ribs and floor.  I then riveted the aft ribs to the aft bulkhead and installed the nutplates
I then installed the rib stabilizer and bearing brackets to the center ribs.  This section of the build is now complete.