This morning I prepped the ribs and bearing brackets for priming. I primed the various parts and then began to assemble them.
I assembled the bearing brackets and riveted the nutplates to the center ribs.
I riveted the aft bulkhead to the baggage area ribs and floor. I then riveted the aft ribs to the aft bulkhead and installed the nutplatesI then installed the rib stabilizer and bearing brackets to the center ribs. This section of the build is now complete.