Friday, July 2, 2010

Continued Work on Nose Ribs


I finished deburring all of the nose ribs today.  I also cut of the rear flanges on the left and right ribs as instructed in the drawings.  I trimmed the upper and lower flanges from several of the ribs as instructed.

 I dimpled the ribs and nutplates as directed in the drawings.  I riveted the nutplates to three (3) of the ribs as instructed.