Tuesday, August 9, 2011

Canopy Attach Angles

 
 
 
This morning I got up early and before leaving for work I worked on the 12.  I drilled and clecoed the fore and aft canopy attach angles on the right side.  They are to be riveted to the canopy frame so the inside edge of the angle is flush with the inside edge of the frame.  I drilled and clecoed each hole as I worked to be certain the edges were flush.  I need to remove the clecoes and angles and deburr the holes before I rivet the angles to the frame.